Ameron Track Expansion

Project Name

Ameron Track Expansion

Project Type

Design and Construction

Completion Date

2009

Location

Fontana, CA

Project Description

Design and construct New Expansion Rail Yard and Gantry Rail to receive, load, and ship 100ft flat railcars with 14’-8” diam. steel wind towers.

Scope of Work

Design and construct approximately 5,000TF (track-feet) of ballasted Yard Tracks, two (2) UPRR #11 Turnouts, four (4) #9 Turnouts (pavement style), and sliding derails with all trackwork consisting of 115# CWR, wood ties, and concrete ties. All design and installation was performed per UPRR Standards.

Owner

Ameron International

JAPClogo_2024_text-icon-rev144

12771 Imperial Highway
Santa Fe Springs, CA 90670
562.944.7985
info@japlacek.com

Links and Resources

The following railroad construction and maintenance resources, directories and associations are being provided for your convenience:

Baldwin Avenue Grade Separation

Project Name

Baldwin Avenue Grade Separation

Project Type

Design and Construction

Completion Date

June 2014

Location

El Monte, CA

Project Description

In coordination with UPRR, construct Double Shoofly Track for construction of new bridge for UPRR Mainline Tracks. As a Subcontractor to Sully-Miller Contracting, JA Placek Construction Co. was responsible for installation & removal of Shoofly Tracks.

Scope of Work

Construct approximately 3,000TF (track-feet) of Double Shoofly Tracks and one (1EA) Power Operated #15 Turnout with 136# CWR and Wood Ties. After completion of new bridge and new Mainline Tracks, remove and dispose 3,000TF of Shoofly Track.

Owner

Alameda Corridor East Construction Authority (ACE)

Additional Information

For more details visit https://www.theaceproject.org/

JAPClogo_2024_text-icon-rev144

12771 Imperial Highway
Santa Fe Springs, CA 90670
562.944.7985
info@japlacek.com

Links and Resources

The following railroad construction and maintenance resources, directories and associations are being provided for your convenience: