Project Name
Fairway Drive Grade Separation Project
Project Type
New Construction
Completion Date
2023
Location
City of Industry, CA
Project Description
The Fairway Drive Grade Separation Project will lower Fairway Drive under the two existing Union Pacific Railroad (UPRR) and Metrolink tracks in the City of Industry and unincorporated area of Los Angeles County, immediately north of the 60 Freeway. Plans call for constructing a four-lane roadway underpass and a new four-track railroad bridge. Business Parkway and Walnut Drive North will be lowered at their intersections with Fairway Drive. A construction contract was awarded in October 2014 and preliminary work began in April 2015. Major construction activities began in June 2018 with the closure of Fairway Drive. Project cost is estimated at $232.3 million.
The project would reduce traffic congestion by an estimated 27.6 vehicle-hours of delay each day at the crossing, used by 49 trains per day, projected to increase to 91 trains per day by 2025. Fairway Drive carries 24,800 vehicles per day which is projected to increase to 26,500 vehicles by 2025. The project would eliminate delays for emergency responders and the potential for crossing collisions, with seven crossing collisions recorded over the past 10 years. The project would also reduce emissions and eliminate locomotive horn and crossing bell noise at the crossing.
Scope of Work
Construct 5,300TF of UPRR Shoofly Track, Construct 6,500TF of UPR Lead Tracks & Industry Tracks, Install 1EA No.11 UPRR Mainline Turnout, Install 4EA No.9 UPRR Turnouts, Remove 10,500TF UPRR Mainline
Owner
Alameda Corridor East Construction Authority (ACE)
Additional Information
For more details visit https://www.theaceproject.org/

12771 Imperial Highway
Santa Fe Springs, CA 90670
562.944.7985
info@japlacek.com
Links and Resources
The following railroad construction and maintenance resources, directories and associations are being provided for your convenience:
Railroad Resources and Directories
Project Name
Baldwin Avenue Grade Separation
Project Type
Design and Construction
Completion Date
June 2014
Location
El Monte, CA
Project Description
In coordination with UPRR, construct Double Shoofly Track for construction of new bridge for UPRR Mainline Tracks. As a Subcontractor to Sully-Miller Contracting, JA Placek Construction Co. was responsible for installation & removal of Shoofly Tracks.
Scope of Work
Construct approximately 3,000TF (track-feet) of Double Shoofly Tracks and one (1EA) Power Operated #15 Turnout with 136# CWR and Wood Ties. After completion of new bridge and new Mainline Tracks, remove and dispose 3,000TF of Shoofly Track.
Owner
Alameda Corridor East Construction Authority (ACE)
Additional Information
For more details visit https://www.theaceproject.org/